term order help what is
Meaning of order BOM (LO-VC). What is it: order for a configurable material. The BOM can be changed.

Helpful?

Definition order BOM (LO-VC)

ORDER BOM (LO-VC) title: order BOM (LO-VC) (SAP Library - Glossary)
ORDER BOM (LO-VC) category: Variant Configuration (LO-VC)
ORDER BOM (LO-VC) explained:

A bill of material (BOM) that is created for one sales order for a configurable material.

The BOM can be changed specifically for the sales order. There are 2 steps to processing an order BOM:

In the sales order, only the top level of the BOM is configured With a special BOM maintenance function, technical changes to the BOM are made and characteristic values assigned to configurable components. Manual changes can also be made.

More terms such as order BOM (LO-VC) in Dictionary O.

Manual Order Item (IS-HMED):
Help individual items of a clinical order. An order item can be, for example, a request for medical services to a service facility or a preregistration for a surgery/treatment appointment for a patient order bom (lo-vc) definition.
Manual Object Reference Variable:
Help Reference variable for object references. Object reference variables are subdivided into class reference variables and interface reference variables order bom (lo-vc) explain.
Manual Original Quantity:
Help The initial quantity specified on a production order before a split is executed order bom (lo-vc) what is.
Manual Overhead Rate (CO):
Help The rate applied to the direct costs to allocate the indirect costs. This can be a flat rate or a percentage order bom (lo-vc) meaning.
Manual On-Balance-Sheet Netting:
Help The netting of balance sheet items in accordance with the requirements set out in the Basel II Accord order bom (lo-vc) abbreviation.
  • Dodano:
  • Autor: