term element cost secondary what is
Meaning of secondary cost element. What is it: activities. Secondary cost elements do not.

Helpful?

Definition secondary cost element

SECONDARY COST ELEMENT title: secondary cost element (CO) (SAP Library - Glossary)
SECONDARY COST ELEMENT category: Controlling (CO)
SECONDARY COST ELEMENT explained:

A cost element that is used to allocate costs for internal activities.

Secondary cost elements do not correspond to any G/L account in Financial Accounting. They are used only in Controlling and consequently cannot be defined in FI as an account.

More terms such as secondary cost element in Dictionary S.

Manual Session Host:
Help initiated an online collaborative session in the portal. Depending on the type of session being conducted, a session guest may have more privileges than the remaining participants (session guests secondary cost element definition.
Manual Subsidy Budget:
Help Positive net vote: for example, the total of the expenditure budget is larger than the total of the revenue budget secondary cost element explain.
Manual Structure Node (FS-BA-SD):
Help A node in the configuration tree. Structure nodes are only ever used for structuring attributes. A structure node can also have lower-level structure nodes or attribute nodes secondary cost element what is.
Manual Service Product (SD):
Help represents a customer's repair request. The service product is represented in the system by a material master record. Service products are measured in the unit of measure piece. You can define secondary cost element meaning.
Manual Short Text (BC-DOC):
Help Text in the software interface of no more than 15 characters in length secondary cost element abbreviation.
  • Dodano:
  • Autor: