STATUS-DEPENDENT PROJECT VERSION title: status-dependent project version (PS) (SAP Library - Glossary)
STATUS-DEPENDENT PROJECT VERSION category: Project System (PS)
STATUS-DEPENDENT PROJECT VERSION explained:
A project version dependent on user or system status created by the system if the status of an object changes, for example, an activity.
More terms such as status-dependent project version in Dictionary S.
- Manual Schedule (PE):
- Help or timetable of a business event. A schedule consists of the day schedules for the individual days of the event. Each day schedule is assigned a day segment consisting of up to three separate time status-dependent project version definition.
- Manual Secondary Method:
- Help is executed in addition to the main method in the execution of a dialog work item or a background work item. A secondary method is connected to the leading method of the step, typically to display status-dependent project version explain.
- Manual Script (CS):
- Help Text created in SAPscript for reminder scripting. It can be fully customized and can include variables status-dependent project version what is.
- Manual Support Package (BC-UPG-OCS):
- Help A list in the Software Delivery Composer with corrected software objects for the delivery component for an Add-On Support Package status-dependent project version meaning.
- Manual Sample-Based Physical Inventory:
- Help measuring of a small part of the stock (sample) that is representative of the entire stock. The sample to be inventoried is determined on a mathematical-statistical basis. A physical inventory count status-dependent project version abbreviation.