SUBPROJECT (PLM-CPR) title: subproject (PLM-CPR) (SAP Library - Glossary)
SUBPROJECT (PLM-CPR) category: Collaboration Projects (PLM-CPR)
SUBPROJECT (PLM-CPR) explained:
A project that is represented as a task in a different project (master project).
More terms such as subproject (PLM-CPR) in Dictionary S.
- Manual Sourcing Hub:
- Help in SRM where open requirements from local and/or backend systems are assigned sources of supply either in the Sourcing Application or via SAP Bidding Engine. The resulting document (purchase order or subproject (plm-cpr) definition.
- Manual Short-Term Inspection:
- Help An inspection that has to be completed before a usage decision can be made for the inspection lot subproject (plm-cpr) explain.
- Manual Service Window (CS):
- Help which service tasks can generally be performed. Service windows are used as the basis for defining service profiles. Example: All service technicians are available every day during usual business subproject (plm-cpr) what is.
- Manual Site Wizard:
- Help @Web Studio for creating ITS sites. You use the site wizard to create the server location(s) for publishing the files required by the Internet Transaction Server (ITS) to start a service and drive an subproject (plm-cpr) meaning.
- Manual Standard Categorization:
- Help Process in which a standard reporting category is assigned to a product in addition to its MDS category subproject (plm-cpr) abbreviation.