term model project automatic what is
Meaning of automatic project model. What is it: how the project structure that is created by.

Helpful?

Definition automatic project model

AUTOMATIC PROJECT MODEL title: automatic project model (CO-PC) (SAP Library - Glossary)
AUTOMATIC PROJECT MODEL category: Product Cost Controlling (CO-PC)
AUTOMATIC PROJECT MODEL explained:

Product Cost Controlling (CO-PC) Template that determines how the project structure that is created by automatic hierarchical controlling is structured. The following models exist:

A0 (Top billing element, account assignment element up to a level):

Under the TOP billing element, account assignment elements are created up to a maximum specified level.

B0 (Top billing element, account assignment element per company code):

Under the TOP billing element, an account assignment element is created on level 2 for each company code.

B1 (Top billing element, account assignment element per company code and profit center):

Under the TOP billing element, an account assignment element is created on level 2 for each company code and profit center.

C0 (Top Billing el. + Billing.El. level 2, Account assign.El. up to a level:

Under the TOP billing element an additional level of billing elements is created that are derived from the characteristics of the external objects for the level 3 account assignment objects. Level 3 corresponds to level 2 in model A0.

D0 (Top Billing el. + Billing.El. level 2, Account assign.El. level 3):

The WBS elements of level 2 (billing elements) and level 3 (account assignment elements) are derived from characteristics.

D1 (Top Billing.El., account assign.El. level 2):

Corresponds to model D0 without the level of billing elements on level 2.

More terms such as automatic project model in Dictionary A.

Manual Alternative Valuation:
Help The valuation of a position different to the valuation that was assigned to a position and with which it is displayed in the position plan automatic project model definition.
Manual Academic Calendar:
Help Timetable that contains the dates of academic events automatic project model explain.
Manual Application Area (FI):
Help Contract Accounts Receivable and Payable to denote those application components used and enhanced by FI-CA. Application areas are stored in every major dataset in FI-CA, enabling data to be processed automatic project model what is.
Manual Automatic Financial Object Integration:
Help Function for automatically deriving or entering the financial object data when transactions are entered automatic project model meaning.
Manual Application Measurement:
Help Measurement of data defining an ICM application. Example The packages used in a particular ICM application automatic project model abbreviation.
  • Dodano:
  • Autor: