term scheduling detailed help what is
Meaning of detailed scheduling. What is it: for orders and operations on a short-term planning.

Helpful?

Definition detailed scheduling

DETAILED SCHEDULING title: detailed scheduling (SCM-APO-PPS) (SAP Library - Glossary)
DETAILED SCHEDULING category: Production Planning and Detailed Scheduling (SCM-APO-PPS)
DETAILED SCHEDULING explained:

Determining the production dates and resource assignment for orders and operations on a short-term planning level while considering constraints, such as the product availability and available capacity.

In the SAP APO Detailed Scheduling component there are various functions with which the scheduling and decision process is supported and with which the optimal operative schedule is created:

Configurable planning table Display of scheduling conflicts Optimization of the schedule taking various criteria into account (for example, lead times, delays, setup times) Automatic evaluation of the scheduling quality Simulation

More terms such as detailed scheduling in Dictionary D.

Manual Decision Task:
Help operation the workflow system uses to execute a user decision in the workflow. The method PROCESS of object type DECISION is always executed with a decision task. Decision tasks only differ in the detailed scheduling definition.
Manual Dangerous Goods Letter:
Help A letter that characterizes the degree of danger in transporting a dangerous goods item detailed scheduling explain.
Manual Doubtful Receivables:
Help A receivable that is not likely to be collected - that is, a complete write-off or a partial write-off of the receivable is to be expected detailed scheduling what is.
Manual Destination-Specific Target Field:
Help Field in a process message destination to which the system transfers the value of a message characteristic detailed scheduling meaning.
Manual Date-Based Validity:
Help with date-based validity is valid from the effective date until a new policy status is created. Unlike period-related validity, no time interval is created. This means that the interval start and detailed scheduling abbreviation.
  • Dodano:
  • Autor: