term planning change help what is
Meaning of net change planning. What is it: in a planning run, in which only the materials that.

Helpful?

Definition net change planning

NET CHANGE PLANNING title: net change planning (PP-MRP) (SAP Library - Glossary)
NET CHANGE PLANNING category: Material Requirements Planning (PP-MRP)
NET CHANGE PLANNING explained:

In PP MRP, the execution of material requirements planning in a planning run, in which only the materials that have had changes relevant to materials planning made to them since the last planning run, are rescheduled.

In APO PPS, net change planning describes the execution of a plan in the production planning run, in which all products that have had planning-relevant changes made to them since the last production planning run (thus receiving a planning file entry) are planned. Any procurement planning heuristic can be used for planning products with net change planning.

In APO SNP, net change planning (as part of the SNP heuristic) also describes planning, in which only location products that have had planning-relevant changes made to them since the last heuristic run (thus receiving a planning file entry) are planned. For example, a planning-relevant change can be a change to the demand situation of the location product.

More terms such as net change planning in Dictionary N.

Manual Net Present Value Concept:
Help Costing procedure based on the cash flow that represents a variation of the traditional, volume-based market interest method net change planning definition.
Manual Natural Account:
Help An element in account codes based on segmentation net change planning explain.
Manual Non-Dialog Work Process:
Help Work process of a different type to dialog (DIA). Other types are (UPD, UP2), enqueue (ENQ), spool (SPO), batch (BTC net change planning what is.
Manual Note (SRM-SUD):
Help of storage of company data in the Business Directory. A company (note owner) stores a note relating to another company (note reference). Similar to structured private data, notes can be viewed only net change planning meaning.
Manual Non-Industrial Accident Insurance:
Help Obligatory insurance for non-industrial accidents (NIAI) by which all employees in Switzerland (whose weekly working time with one employer is at least 12 hours) are covered net change planning abbreviation.
  • Dodano:
  • Autor: