PLANNED CONSUMPTION title: planned consumption (MM-IM) (SAP Library - Glossary)
PLANNED CONSUMPTION category: Inventory Management (MM-IM)
PLANNED CONSUMPTION explained:
The difference between total consumption and unplanned consumption.
Planned consumption is updated if goods are withdrawn from stock based on a reservation.
Unplanned consumption is updated if goods are withdrawn without a reservation.
More terms such as planned consumption in Dictionary P.
- Manual Public-Owned Commercial Operation:
- Help commercial operations are institutions with the intention of generating continuous revenues and are maintained by the state. Works for generating revenues for forestry and agriculture are excluded planned consumption definition.
- Manual Preventive Maintenance (PM):
- Help The tasks that are performed in Plant Maintenance to maintain the target condition (preventive maintenance) and to determine the condition (inspection) of a technical system planned consumption explain.
- Manual Patient In Hospital Beyond Specified Key Date:
- Help Patient who is undergoing inpatient or day patient treatment beyond a specified key date. Example Patient being treated over the year end period (key date is December 31 planned consumption what is.
- Manual Period Split (PP-MRP):
- Help A division of the time axis into periods, for example, days, weeks, or months planned consumption meaning.
- Manual Predecessor (IS-HMED):
- Help Is used to connect two corresponding values for a vital sign. Example RR (blood pressure) is the predecessor for the diastolic value and the systolic value planned consumption abbreviation.