PRE-SEASON SAFETY STOCK SHIFT title: pre-season safety stock shift (SCM-APO-SPP) (SAP Library - Glossary)
PRE-SEASON SAFETY STOCK SHIFT category: Service Parts Planning (SCM-APO-SPP)
PRE-SEASON SAFETY STOCK SHIFT explained:
Method in distribution requirements planning (DRP) to achieve the highest possible level of service.
During the pre-season safety stock shift, the system brings forward stock by shifting the higher safety stock of a coming period to the current period.
More terms such as pre-season safety stock shift in Dictionary P.
- Manual Product Variant (CRM):
- Help Variant of a configurable product. The options of a product variant are defined in the product master (as characteristic values pre-season safety stock shift definition.
- Manual Planning Interval:
- Help Period during which the resource can be used in planning. Outside of this period the resource is fixed and cannot be used in planning pre-season safety stock shift explain.
- Manual Product Hierarchy (LO):
- Help An alphanumeric character string for grouping materials by combining different characteristics. The product hierarchy is used for evaluation and pricing pre-season safety stock shift what is.
- Manual Phone Call Overwiev:
- Help Statistical analysis of the selected sales activities and the orders resulting from them pre-season safety stock shift meaning.
- Manual Production Tracking:
- Help Logging a production process by saving or processing information at predefined stations of a production line or at predefined work centers pre-season safety stock shift abbreviation.