SETUP TIME (PP) title: setup time (PP) (SAP Library - Glossary)
SETUP TIME (PP) category: Production Planning and Control (PP)
SETUP TIME (PP) explained:
The time needed to prepare the work center for operations to perform there.
The setup time is part of the lead-time.
More terms such as setup time (PP) in Dictionary S.
- Manual Storage Unit:
- Help A logical grouping of one or several amounts of material that can be managed in a warehouse as a unit. Each storage unit has a storage unit (SU) number setup time (pp) definition.
- Manual Simulation Type:
- Help Simulation parameter for ALM simulation that is defined in Customizing. Used in Release 4.62 in the standard simulation for closing gaps setup time (pp) explain.
- Manual Simulation (PT):
- Help Evaluation of time data for future periods, whereby the system does not save the results of time evaluation setup time (pp) what is.
- Manual Service Area Activity:
- Help Reserves the service area. You can only define one service area activity for a slot task list setup time (pp) meaning.
- Manual Screen Part:
- Help Part of an infotype screen version in the blueprint framework. The following screen areas exist: Main screen Table screen Subscreen View screen setup time (pp) abbreviation.