term target costs help what is
Meaning of target costs (CO-PC). What is it: is produced. In Cost Object Controlling, the target.

Helpful?

Definition target costs (CO-PC)

TARGET COSTS (CO-PC) title: target costs (CO-PC) (SAP Library - Glossary)
TARGET COSTS (CO-PC) category: Product Cost Controlling (CO-PC)
TARGET COSTS (CO-PC) explained:

The costs expected to be incurred when a specific quantity is produced.

In Cost Object Controlling, the target costs are calculated on the basis of the planned values of a service unit (such as the planned cost of a production order) and the control quantities (such as the yield delivered to stock).

Target costs can be used for purposes such as:

To determine variances To valuate work in process To valuate unplanned scrap

More terms such as target costs (CO-PC) in Dictionary T.

Manual Target Costs (CO-OM-CCA):
Help expected to arise in connection with the performance of a particular activity. Target costs are calculated using the planned costs for the cost center and the planned costs for the activity to be target costs (co-pc) definition.
Manual Type (BC-SRV-RM):
Help element types according to their semantic content. The type provides the user with orientation when searching for element types (examples of types are Documents , Business Objects , or Transactions target costs (co-pc) explain.
Manual Total Weight Of A Packing Proposal:
Help Contains the tare weight of the packaging material and the weight of the materials packed on it target costs (co-pc) what is.
Manual TraceFormatter:
Help Formats log records as human-readable lines target costs (co-pc) meaning.
Manual Transaction Figures (FS-AM-IM-BC):
Help Total of all postings to an account per posting and value date day, separated according to debit and credit target costs (co-pc) abbreviation.
  • Dodano:
  • Autor: