TIME-BASED SCENARIO title: time-based scenario (SV-ASA) (SAP Library - Glossary)
TIME-BASED SCENARIO category: ASAP (AcceleratedSAP) (SV-ASA)
TIME-BASED SCENARIO explained:
A business flow that is triggered by the passage of time, such as month-end closing, standard cost revaluation, or check run.
More terms such as time-based scenario in Dictionary T.
- Manual Task (PLM-CPR):
- Help used to define the required work in a project. A project task contains the data indicating what needs to be carried out in a project, within which time frame, and the amount of work required time-based scenario definition.
- Manual Theil Coefficient:
- Help indicates the quality of the forecast model used compared with the primitive forecast. The primitive forecast uses the last historical value for the forecast value. The Theil coefficient is: 1 if the time-based scenario explain.
- Manual Technical Reference Object:
- Help service is carried out. CRM contains connection objects, connections and points of delivery replicated from the IS-U data model. Both the IS-U contracts and service management (from the Plant time-based scenario what is.
- Manual Type Of Case End:
- Help Type of ending of outpatient cases. Examples End of quarter End of treatment Automatically ended time-based scenario meaning.
- Manual Type Group (BC-DWB-DIC):
- Help Group for storing user-defined data types or constants in the ABAP Dictionary so that they can be accessed by any program. The ABAP statement used for this purpose is TYPE-POOLS time-based scenario abbreviation.