term resource other help what is
Meaning of other resource (PE). What is it: and instructors. If your system is not integrated with.

Helpful?

Definition other resource (PE)

OTHER RESOURCE (PE) title: other resource (PE) (SAP Library - Glossary)
OTHER RESOURCE (PE) category: Training and Event Management (PE)
OTHER RESOURCE (PE) explained:

A resource type that includes all resources except rooms and instructors.

If your system is not integrated with the Materials Management component and you do not have access to the materials stored in the material master data record, you can use this resource type as an alternative to the resource type material. There is no integration needed for this resource type.

Example

Training materials, PCs.

More terms such as other resource (PE) in Dictionary O.

Manual Ordered:
Help The quantity of items ordered from a vendor plus items that are due to enter the warehouse from production other resource (pe) definition.
Manual OO Transaction:
Help code of a OO transaction is linked with a method of a local or globalclass. At the call of the transaction, the corresponding program is loaded, in instance methods an object of the class is created other resource (pe) explain.
Manual Override Requirement:
Help identifies exceptions that apply to staffing requirements. Exceptions override the normal staffing requirements that have been defined for a specified period of time. Exceptions are defined when no other resource (pe) what is.
Manual Outlook Calendar Integration:
Help Calendar integration in which Microsoft Outlook is connected to the SAP system as a calendar client other resource (pe) meaning.
Manual Object Editor:
Help page pattern. The Object Editor pattern is used to design, create, or edit ideas, objects, and object attributes within an application. The resulting editor, whose components are provided as other resource (pe) abbreviation.
  • Dodano:
  • Autor: